What is a HVAC Control System?

HVAC Control System

 

WHAT IS A HVAC CONTROL SYSTEM?

 

The HVAC Control System is the brain that regulates and performs monitoring the operation of a heating and/or air conditioning system.

Usually, a sensing device is used to compare the actual state

(e.g. temperature, relative humidity, and differential pressure) with a target state.

What is an HVAC Direct Digital Control System (DDC)?

The HVAC control system (known as Direct Digital Control System DDC) is a central controller(s) programmable unit responsible to manage the logic of the input and output signals and parameters of all AHU Air handling units and cleanrooms.  The direct digital control program code can be customized for the intended use.

It allows the administrator to set and predefine time schedules, setpoints, controllers, logic, timers, trend logs, and alarms.

HVAC Control System DDC
HVAC Control System DDC

The unit controllers typically have analog and digital inputs that allow measurement of the variable (temperature, relative humidity, or differential pressure) and analog and digital outputs for control of the transport medium (hot/cold water and/or steam).

Digital Inputs

Digital inputs are typically (dry) contacts from a control device, and analog inputs are typically a voltage or current measurement from a variable (temperature, relative humidity, airflow/velocity, or differential pressure) sensing device.

Digital Outputs

Digital outputs are typically relaid contacts used to start and stop equipment, and analog outputs are typically voltage or current signals to control the movement of the medium (air/water/steam) control devices such as valves, dampers, and motors.

HVAC control panel
HVAC control panel

The digital direct controller(s) is responsible to run the logic that triggers the action for the position of every damper and valve in a system.

It determines which fans, pumps, and chiller run and at what speed or capacity.

Typically, the HVAC control system has human user interphase in which the administrator and operators can see the actual condition, status, and setpoints of each parameter and environmental conditions in a screen similar to the diagram above.

For more information, refer to httpss://www.iso.org/standard/53394.html

For a preview, refer to httpss://www.iso.org/obp/ui/#iso:std:iso:14644:-1:ed-2:v1:en

 

Want to learn more about

HVAC CONTROL SYSTEM?

Subscribe and follow us on social media.

More details on specific FDA expectations for HVAC CONTROL SYSTEM can be found in the guidance document below.httpss://www.iso.org/standard/53394.html

For a preview, refer to httpss://www.iso.org/obp/ui/#iso:std:iso:14644:-1:ed-2:v1:en

Three (3) options to create a qualification protocol for HVAC Control System

Option 1.

You can create a great protocol, using a template.

You can download a free sample of a validation template in .pdf format. 

To see the complete list of the most popular validation templates, click here.

In addition, you can request a quotation to buy online a full validation template document in MS Word format that is completely editable, ready to fill, and adapt to your needs.

Option 2.

We can bring you a formal training on how to create your own validation protocols using our template(s).

This option is recommended if you want to learn more about how to build a robust validation protocol. One of our expert(s) will provide online step-by-step training to your team (unlimited assistance) on how to build a reliable validation protocol using a template. You can improve your corporate validation procedures and policies incorporating our template sections.  It includes the template, an exam, and a training certificate for each assistant.  Request a quote now.

Option 3.

We can create a customized qualification.

One of our expert(s) will create and prepare for you a customized validation protocol with the inputs and specific information of your company. It may include, online support in document creation, execution, or final reporting, Request a quote online.

GET IN COMPLIANCE TODAY, CONTACT US (Hablamos Español)

STATUTORY AND REGULATORY REQUIREMENTS

FOR HVAC CONTROL SYSTEM

Validation for drugs (finished pharmaceuticals and components) is a legally enforceable requirement under section 501(a)(2)(B) of the Act (21 U.S.C. 351(a)(2)(B)), which states the following:

“… a drug (including a drug contained in a medicated feed) shall be deemed to be adulterated if the methods used in, or the facilities or controls used for, its manufacture, processing, packing, or holding do not conform to or are not operated or administered in conformity with current good manufacturing practice to assure that such drug meets the requirement of the act as to the safety and has the identity and strength, and meets the quality and purity characteristics, which it purports or is represented to possess.”

Process validation for drugs (finished pharmaceuticals and components) is a legally enforceable requirement under section 501(a)(2)(B) of the Act (21 U.S.C. 351(a)(2)(B)), which states the following:

FDA regulations describing current good manufacturing practice (CGMP) for finished pharmaceuticals are provided in 21 CFR parts 210 and 211.

The CGMP regulations require that manufacturing processes be designed and controlled to assure that in-process material and the finished product meet predetermined quality requirements and do so consistently and reliably.

Process validation is required, in both general and specific terms, by the CGMP regulations in parts 210 and 211. The foundation for process validation is provided in § 211.100(a), which states that “[t]here shall be written procedures for production and process control designed to assure that the drug products have the identity, strength, quality, and purity they purport or are represented to possess…” (emphasis added). This regulation requires manufacturers to design a process, including operations and controls, which results in a product meeting these attributes.

Other CGMP regulations define the various aspects of validation. For example, § 211.110(a), Sampling and testing of in-process materials and drug products, requires that control procedures “. . . be established to monitor the output and to validate the performance of those manufacturing processes that may be responsible for causing variability in the characteristics of in-process material and the drug product” (emphasis added).

Under this regulation, even well-designed processes must include in-process control procedures to assure final product quality. In addition, the CGMP regulations regarding sampling set forth a number of requirements for validation:

Samples must represent the batch under analysis (§ 211.160(b)(3)); the sampling plan must result in statistical confidence (§ 211.165(c) and (d)), and the batch must meet its predetermined specifications (§ 211.165(a)).

In addition to sampling requirements, the CGMP regulations also provide norms for establishing in-process specifications as an aspect of process validation. Section 211.110(b) establishes two principles to follow when establishing in-process specifications. The first principle is that

“. . . in-process specifications for such characteristics [of in-process material and the drug product] shall be consistent with drug product final specifications . . . .”

Accordingly, in-process material should be controlled to assure that the final drug product will meet its quality requirements. The second principle in this regulation further requires that in-process specifications “. . . shall be derived from previous acceptable process average and process variability estimates where possible and determined by the application of suitable statistical procedures where appropriate.”

This requirement, in part, establishes the need for manufacturers to analyze process performance and control batch-to-batch variability.

The CGMP regulations also describe and define activities connected with process design, development, and maintenance. Section 211.180(e) requires that information and data about product quality and manufacturing experience be periodically reviewed to determine whether any changes to the established process are warranted. Ongoing feedback about product quality and process performance is an essential feature of process maintenance.

In addition, the CGMP regulations require that facilities in which drugs are manufactured be of suitable size, construction, and location to facilitate proper operations (§ 211.42). Equipment must be of appropriate design, adequate size, and suitably located to facilitate operations for its intended use (§ 211.63). Automated, mechanical, and electronic equipment must be calibrated, inspected, or checked according to a written program designed to assure proper performance (§ 211.68).

References

httpss://www.accessdata.fda.gov/scripts/cdrh/cfdocs/cfcfr/CFRSearch.cfm?fr=225.1

https://www.imdrf.org/docs/ghtf/final/sg3/technical-docs/ghtf-sg3-n99-10-2004-qms-process-guidance-04010.pdf

httpss://www.fda.gov/media/94074/download

httpss://www.accessdata.fda.gov/scripts/cdrh/cfdocs/cfcfr/CFRSearch.cfm?fr=225.1

httpss://www.fda.gov/regulatory-information/search-fda-guidance-documents/part-11-electronic-records-electronic-signatures-scope-and-application

httpss://ispe.org/publications/guidance-documents/gamp-5

https://www.imdrf.org/docs/ghtf/final/sg3/technical-docs/ghtf-sg3-n99-10-2004-qms-process-guidance-04010.pdf

httpss://www.fda.gov/media/94074/download

https://www.imdrf.org/docs/ghtf/final/sg3/technical-docs/ghtf-sg3-n99-10-2004-qms-process-guidance-04010.pdf

httpss://www.fda.gov/media/94074/download

httpss://www.accessdata.fda.gov/scripts/cdrh/cfdocs/cfcfr/CFRSearch.cfm?fr=225.1

httpss://www.fda.gov/regulatory-information/search-fda-guidance-documents/part-11-electronic-records-electronic-signatures-scope-and-application

httpss://ispe.org/publications/guidance-documents/gamp-5

Related topics and resources:

Validation Plan, Installation Qualification, Operational Qualification, Performance Qualifications, Component Qualification, Traceability Matrix, Ppk, Control Charts, Cpk, User Requirements, Functional Requirement Specifications, GAMP5, risk assessment

Picture of Ramon Cayuela, MS, BS, Chemical Engineering

Ramon Cayuela, MS, BS, Chemical Engineering

CIQA President and CEO.
I've been working in validation engineering since 1992 with many multinational pharmaceutical companies. I love sharing my passion and knowledge with others. If you have any questions about anything (or just have general questions). I will be more than happy to assist you. You can count on the BEST customer service on CIQA. I go to great lengths to make sure my clients are 100% satisfied with their purchases and check emails/messages consistently throughout the day. You can rest assured that everything being sold here is as-described or your money back. I look forward to working with you!